Week of March 7th
Monday we started cutting back the
overhang from old roof in Florida Room.
Then it was putting up more 'jack' studs.

Framing the brick wall for 1/2" OSB for the pine
paneling to be nailed to.


Thursday we took out the sliding door to the bedroom.
Friday framed the opening for 5'0' French Doors.
L

BACK <-